Bridge 198.5 Decking Replacement
Project Details
Owner: BNSF Railway
Location: Keddie, CA | August 2021 – September 2021
In July 2021, the Dixie fire destroyed thousands of acres in the northern California mountains. One of the structures destroyed was timber decking on BNSF Bridge 198.5 near Keddie, CA. BNSF contacted a small, select group of contractors on July 28th and bid the project with 24 Hr. turnaround. Advanced American Construction (AAC) was selected and mobilized management to the site immediately. AAC had a crew and equipment to the site by August 9th.
AAC’s crews worked compositely with BNSF to remove the remaining rail & tie from the bridge. AAC had a second crew constructing new bridge deck panels in a nearby laydown yard. Once the debris was cleared from the bridge, AAC & BNSF crews placed new deck panels, secured them to the bridge girders, installed track panels and graded with ballast rock. The work was performed safely with considerable fall hazards present.
Project Highlights
- 66 Bridge deck panels constructed
- 455 Feet of rail & tie removed
- 455 Feet of bridge deck panels installed
- The original contracted work was delivered 4 days ahead of schedule
- All work was performed safely, with no incidents
- AAC & BNSF teams collaborated significantly to coordinate efforts and make this project a success in an active wildfire zone.





















