BNSF Bridge 37.0 Fender System Replacement

Prime Contractor: Advanced American Construction
Owner: BNSF Railway

Everett, WA
|
July 2019 - October 2019
« Previous ProjectNext Project »Back to Projects

Project Details

AAC was contracted by BNSF railway to complete the replacement of the bridge 37.0 fender system on the Snohomish River.  The fender system provides protection to the bridge for marine traffic in the Snohomish River.  With daily barge and tug movements, the replacement of the fender system had to be accomplished without putting the bridge at risk.

AAC mobilized a derrick barge and other floating gear to start the sequential removal and replacement of the fender system.  Because all the work was performed next to an in-service rail line and continued operation of the swing span bridge for marine traffic, AAC had to work closely with BNSF to schedule critical activities and prevent any disruptions.      

Following the best management practices for environmental stewardship, all work was performed without any environmental issues.   
 

Project Highlights

  • Existing timber fender piles extracted
  • New timber fender piles driven
  • New timber whalers installed
  • 50 Tons of timber materials recycled
  • New catwalk, handrail and safety ladder