PGE North Fork Dam

Prime Contractor: Advanced American Construction
Owner: Portland General Electric

Estacade, OR
|
April 2003 - November 2003
« Previous ProjectNext Project »Back to Projects

Project Details

The project involved the installation of a 60-foot x 50-foot bulkhead dewatering system and installing new seals, sandblasting, and painting the three gates at Portland General Electric's North Fork Dam on the Clackamas River. 

Project Highlights

  • Installation of 60-foot x 50-foot bulkhead dewatering system.
  • Install new seals, sand-blast and paint three gates.
  • Innovative bulkhead design and installation.
  • Limited access requirement necessitated the use of a crane barge.

Project Photos