Project Details
AAC transported the Temco ship loader components including the towers and cradles from the Columbia Business Center via AAC barge and tug to Temco’s facility in Kalama, Washington. AAC then handled the rigging, hoisting and placement of all components at the Temco site, which included a 2-crane pick for the installation of the cross conveyor using the DB Millennium. The cross conveyor measured 300 feet long, 300,000 lbs. and 75 feet in the air.
AAC completed this project from contract to completion with notable efficiency in less than 3 months. We provided comprehensive services including advanced lift design and full installation of the Temco ship loader.